Education & Community Infrastructure · 2025

Auditorium, Al-Hamra Community HallIrakkakandy Auditorium

Development of a large-span school auditorium to support educational assemblies, cultural activities, examinations, and inter-village community programs in Irakkakandy.

Client / Sector

Barakah Charity & Al-Hamra Vidyalayam

Location

Irakkakandy, Trincomalee District

Timeline

2025

Scope

School Auditorium · Steel Truss Framing · Stage & Acoustics

Project Overview

A grand civic assembly space in Irakkakandy.

Prior to this undertaking, Al-Hamra Vidyalayam lacked any covered space capable of assembling the full student body or hosting national examinations. School events had to take place beneath temporary tarpaulins.

Barakah Charity broke ground on this multi-functional auditorium on 9 December 2025. Designed with high-clearance steel trusses and acoustic baffles, it accommodates over 600 attendees.

600+Seating Capacity
Large SpanColumn-Free Interior
9 Dec 2025Groundbreaking Date
Auditorium, Al-Hamra
Civic & School Auditorium
Veranda & Passive Louvered Ventilation Eaves · Irakkakandy

Veranda & Passive Louvered Ventilation Eaves · Irakkakandy

01 / 02
600+SEATING CAPACITY

Column-free central assembly hall

7,500SQ FT AREA

Spacious multi-purpose civic footprint

9 DecSTARTED DATE

Commenced December 2025

Multi-UsePURPOSE

Examinations, cultural events, & civic meetings

Scope execution
Certified Construction Audit
Scope of Work

Large-span architecture for community cohesion.

Engineered foundation piers designed for wide-span structural loads
High-clearance column-free steel portal frame superstructure
Elevated performance stage with backstage green rooms and egress
Acoustic absorption panelling to control echo during speech and music
High-volume natural air exchange louvres and industrial ceiling fans
Emergency exit panic hardware and fire safety compliance
Project MilestoneConstruction Started 9 December 2025
Architectural Study

Spatial textures and civic presence.

Visual records detailing structural joinery, concrete curing, and thermal circulation pathways.

Completed School & Civic Auditorium
Completed School & Civic Auditorium
Main Entrance Portico & Facade
Main Entrance Portico & Facade
Side Veranda & Passive Ventilation Eaves
Side Veranda & Passive Ventilation Eaves
Our Process

Blueprint to Reality.

From soil borehole test reports to final municipal certificate handovers, every stage is audited by independent civil engineers.

01

Structural Engineering Design

Engineering large-span steel rafters for maximum unimpeded sightlines.

02

Deep Foundation Piling

Casting reinforced concrete footings to carry wide roof spans.

03

Steel Frame Erection

Mounting anti-corrosion treated steel portal frames and purlins.

04

Enclosure & Stage Fit-out

Constructing masonry side walls, stage joinery, and electrical rough-ins.

Architectural perspective left
Architectural perspective right
“
“This auditorium will become the cultural heart of Irakkakandy. For generations, our children will celebrate milestones here.”
— M. S. M. Anfas · Principal · Al-Hamra Vidyalayam, Irakkakandy
Project Gallery

Documented perspectives.

Auditorium Grand Overview
Exterior
Entrance Colonnade & Portico
Architecture
Veranda & Daylight Louvers
Details
Auditorium Walkthrough Frame
Video Capture
Site Grounds & Approach
Perimeter
Structural Steel Frame Assembly
Construction
Credits

Team & Collaborators.

Executed with transparent contractor agreements, accredited engineering oversight, and community steering committees.

Project SponsorBarakah Charity Sri Lanka Donors
Structural EngineeringEastern Civil Engineering Consultants
Accreditations:Irakkakandy Civic Infrastructure Award 2025
Barakah Multi Complex
Next Project

Barakah Multi Complex Civic Pavilion

Kinniya, Trincomalee · 2025