Skip to content
Al-Furqan Vidyalayam
School Infrastructure · 2025

Al-Furqan Vidyalayam School BuildingChina Bay Campus

A 2-classroom school building constructed with Barakah Charity support and officially commissioned by Brother Mohamed Ajami, CEO of Swiss Barakah Charity.

Client / Sector

Swiss Barakah Charity & Barakah Charity Sri Lanka

Location

Sinnampillaichenai, China Bay, Trincomalee

Timeline

2025

Scope

2-Classroom School Building · International Partnership

Project Overview

International partnership empowering China Bay students.

Constructed with pivotal philanthropic support from Swiss Barakah Charity, this building at Al-Furqan Vidyalayam in China Bay stands as a benchmark of humanitarian architectural craftsmanship.

Officially opened by Brother Mohamed Ajami on 28 July 2025, the facility provides two spacious, naturally lit classrooms, complete with modern desks and high-durability fittings.

135+Students Impacted
2Full Classrooms
Swiss BarakahOfficial Partner
Al-Furqan Vidyalayam
Academic Pavilion
Opening Ceremony Led by Brother Mohamed Ajami, CEO Swiss Barakah Charity

Opening Ceremony Led by Brother Mohamed Ajami, CEO Swiss Barakah Charity

01 / 03
2 RoomsCLASSROOM UNITS

Spacious dual hall configuration

135+PUPILS BENEFITING

Daily primary & middle school classes

28 JulyINAUGURATION DATE

Commissioned by Swiss Barakah delegation

100%HIGH SPEC FINISHES

Industrial-grade terrazzo and washable walls

Scope execution
Certified Construction Audit
Scope of Work

Excellence in design and community service.

Engineered foundation with anti-subsidence soil compaction
Reinforced concrete frame with double-layer steel mesh reinforcement
Two spacious classroom suites with acoustic ceiling insulation
Ceramic blackboards, wooden podiums, and ergonomic desks
Thermal clay roof tiles over moisture barrier underlayment
Direct verification and audit by Swiss Barakah leadership
Project MilestoneFoundation 9 May 2025 · Opened 28 July 2025
Architectural Study

Spatial textures and civic presence.

Visual records detailing structural joinery, concrete curing, and thermal circulation pathways.

Completed Al-Furqan Classroom Block
Completed Al-Furqan Classroom Block
Classroom Interior with High Windows
Classroom Interior with High Windows
Inauguration with Swiss Barakah CEO
Inauguration with Swiss Barakah CEO
Our Process

Blueprint to Reality.

From soil borehole test reports to final municipal certificate handovers, every stage is audited by independent civil engineers.

01

Project Initiation

Foundation stone laid on 9 May 2025 with school community.

02

Fast-Track Construction

Deploying dedicated masonry and structural teams to deliver ahead of schedule.

03

Joinery & Furnishing

Fitting durable hardwood windows, doors, and student seating.

04

International Delegation Visit

Grand handover on 28 July 2025 with Brother Mohamed Ajami.

Architectural perspective left
Architectural perspective right
“
“To see our children studying in such a beautiful, dignified building brings tears of joy to every parent in China Bay.”
— S. M. Rauf · Community Elder · China Bay Village Council
Project Gallery

Documented perspectives.

Main Building Facade
Exteriors
Bright Classroom Interior
Interiors
Opening Ribbon Cutting with Swiss Barakah
Community
Credits

Team & Collaborators.

Executed with transparent contractor agreements, accredited engineering oversight, and community steering committees.

Major DonorSwiss Barakah Charity & Brother Mohamed Ajami
Implementing PartnerBarakah Charity Sri Lanka
Civil ContractorChina Bay Engineering Projects
Accreditations:Swiss Barakah Flagship Partnership Award 2025
An-Noor Vidyalayam
Next Project

An-Noor Vidyalayam Educational Complex

Thoppur–Serunuwara, Trincomalee · 2025

View Project
Fund an Initiative

Commission a school, well, or dialysis unit in your name.

Every project includes engraved dedication plaques, comprehensive financial accounting, and certified drone video verification upon completion.